Brigade Innovation Gardens Specifications
Brigade Innovation Gardens specifications Include RCC structure, UPVC windows, BESCOM power, and DG backup for lifts. It also covers the Material, finish and fitting specifications of this township.
Project, location & connectivity: The project is a development by Brigade Group. The site is at Haraluru and Muddenahalli, Devanahalli KIADB Phase II, North Bengaluru, Karnataka 562110. Kempegowda International Airport is approximately 19.8 km away, about 21 minutes by road. The nearest Namma Metro station, KIAL Terminals, is approximately 19.6 km / 22 minutes away and under construction.
Specification Table, Category by Category
Brigade Innovation Gardens specifications are listed below by category. Rows marked (confirmed) come from the official project brief; rows marked “To be announced” have not been officially released and are deliberately left blank rather than filled with assumptions.
Structure & Development
| Project Type | Township (confirmed) |
| Developer | Brigade Group (confirmed) |
| Land Area | 75 Acres (confirmed) |
| Total Towers | 16 Towers (confirmed) |
| Total Units | 7,195 units (confirmed) |
| Floors | Up to G+30 / maximum 35 floors (confirmed) |
| Basement Levels | To be announced |
| Maximum Building Height (metres) | To be announced |
| Structural System | To be announced |
| Seismic Design Compliance | To be announced |
| External Wall Construction | To be announced |
| Internal Wall Construction | To be announced |
Apartment Configurations
| 1 BHK | 610 – 800 sq. ft. SBA (confirmed) |
| 2 BHK | 1,000 – 1,250 sq. ft. SBA (confirmed) |
| 3 BHK | 1,400 – 1,750 sq. ft. SBA (confirmed) |
| 4 BHK | 2,050 – 2,550 sq. ft. SBA (confirmed) |
| Bathrooms per Configuration | To be announced |
| Carpet Area (RERA) | Awaited — RERA disclosure pending |
| Ceiling Height | To be announced |
| Balcony Provision | To be announced |
| Unit Handover Condition | To be announced |
Project Status & Timeline
| Project Status | Pre-Launch (confirmed) |
| Pre-Launch | September 2026 (confirmed) |
| Launch | November 2026 (expected) |
| Completion | November 2030 (expected) |
| Possession | December 2030 (expected) |
| RERA Registration | Awaited |
Flooring & Finishes
| Living & Dining Flooring | To be announced |
| Bedroom Flooring | To be announced |
| Kitchen Flooring & Counter | To be announced |
| Bathroom Flooring & Dado | To be announced |
| Balcony & Utility Flooring | To be announced |
| Internal Wall Finish | To be announced |
| External Wall Finish | To be announced |
| Ceiling Finish | To be announced |
Doors, Windows & Fittings
| Main Door | To be announced |
| Internal Doors | To be announced |
| Windows & Glazing | To be announced |
| Kitchen Sink & Fittings | To be announced |
| Sanitary Ware Brand | To be announced |
| CP Fittings Brand | To be announced |
| Modular Kitchen Provision | To be announced |
| Wardrobe Provision | To be announced |
| Appliance Provision | To be announced |
Building Services & Utilities
| Electrical Wiring & Switches | To be announced |
| Power Backup | To be announced |
| Lifts per Tower | To be announced |
| Water Supply & Treatment | To be announced |
| Sewage Treatment Plant | To be announced |
| Rainwater Harvesting | To be announced |
| Fire Detection & Fighting Systems | To be announced |
| Security & Surveillance Systems | To be announced |
| Telecom, Internet & DTH Provision | To be announced |
| EV Charging Provision | To be announced |
| Car Parking Allocation | To be announced |
| Waste Management | To be announced |
How to Verify Brigade Innovation Gardens Specifications
Brigade Innovation Gardens specifications will become binding only through official documentation. When the specification sheet is released, check it in the following order.
1. The agreement for sale
This is the document that binds the developer. A specification that appears in a brochure but not in the agreement is marketing material, not a commitment.
2. The RERA disclosure
Once the RERA registration is completed — currently awaited, pending official Karnataka RERA portal update — the statutory filing will carry declared specifications, common areas and amenities. Cross-check it against the brochure.
3. The sanctioned plan
Verify that structural elements, ceiling heights, balcony provisions and unit layouts match what has been approved by the competent authority.
4. Get substitution clauses in writing
Most specification sheets permit “equivalent or better” substitution. Ask what the substitution criteria are and who determines equivalence.
5. Check tower-specific details
In a 16-tower township, specifications and handover dates can differ between towers or phases. Confirm that the specification sheet you are given applies to the specific tower and phase you are booking in.
- Which brand and grade is specified for each finish?
- What is the RERA carpet area, and what is excluded from it?
- What is the clear ceiling height, floor to underside of slab?
- How many lifts serve each tower, and what is the rated capacity?
- How many basement levels does the tower have, and what is its height in metres?
- What power backup is provided per apartment, in kVA?
- How many parking slots are allotted per configuration, and are they charged separately?
- What is the handover condition — bare shell, semi-finished or fully finished?
See the Brigade Innovation Gardens floor plans, master plan, amenities and price details.
Get the Brigade Innovation Gardens specification sheet
Leave your details and we will send the official specification sheet, brochure and current price sheet as soon as the developer releases them.
Specification FAQs — Brigade Innovation Gardens
What is confirmed about the township, and why material and brand specifications are not published yet.
Brigade Innovation Gardens specifications confirmed at this stage cover the scale of the township: 75 acres, 16 towers, 7,195 units, towers up to G+30 with a maximum of 35 floors, and 1, 2, 3 and 4 BHK apartments from 610 to 2,550 sq. ft. SBA. Material, finish, fitting and service specifications have not been officially released and are marked as awaited.
Flooring specification has not been officially released for this project. We do not publish assumed or typical flooring specifications. The official specification sheet will be published here once the developer issues it.
Sanitary ware and CP fittings brands have not been announced. No brand names are published on this website for this project because none has been officially confirmed.
Kitchen provision and handover condition have not been officially specified. Confirm what is included in writing on the agreement for sale before booking.
Ceiling height has not been officially published for this project and is marked as awaited.
Lift count per tower and per core has not been officially disclosed. On towers planned up to G+30, with a maximum of 35 floors, this is a material question — ask for it in writing.
Basement levels and maximum building height in metres have not been officially released. The project brief confirms towers of up to G+30, with a maximum of 35 floors.
Power backup provision has not been officially specified. Details will be published here once released by the developer.
EV charging provision has not been officially confirmed for this project.
Parking allocation per configuration has not been published at pre-launch stage. Confirm the allocation and whether parking is charged separately before booking.
Brigade Innovation Gardens entered pre-launch in September 2026 and the formal launch is expected in November 2026. The specification sheet will be published here once the developer releases it.
Because they genuinely have not been released. Brigade Innovation Gardens is at pre-launch stage. Publishing a plausible-looking specification list that the developer has never issued would mislead buyers and could not be enforced against the developer.